Water and Sewage Networks Database Project - Qassim, Al-Baha, Makkah, Riyadh Suburbs

Following the surveying phase, Geographic Information Systems (GIS) activities are undertaken for the water and sewage networks in the regions of Qassim, Al-Baha, Makkah, and the suburbs of Riyadh. The specialized office team is involved in several tasks:

– Data Input and Verification:

  The specialized office team is responsible for inputting data, verifying texts through images, and incorporating all relevant data from the images. This is done according to the database received from the Water Directorate.

– GIS Office Team Activities:

  The GIS office team, with its expertise, engages in drawing the network and adjusting it in terms of connectivity, elevation profiles, and other requirements. This involves utilizing the received database to ensure accurate representation and effective management of the water and sewage networks.

This project focuses on the precise documentation and design of the water and sewage infrastructure, utilizing GIS to enhance the accuracy and efficiency of the network, ultimately contributing to improved water and sanitation services in the specified regions.

**Electric Network Data Collection and Conversion to Geographic Information Systems (GIS) Project – Al-Baha, Al-Kharj, Qassim, Al-Qatif, Riyadh Suburbs, Asir, Hail:**

In this project, the specialized team is involved in collecting data and converting the electric network into GIS in the regions of Al-Baha, Al-Kharj, Qassim, Al-Qatif, Riyadh suburbs, Asir, and Hail. The process involves several key steps:

– **Data Input and Verification:**

  The specialized team is responsible for entering data, ensuring the accuracy of texts through images, and incorporating all relevant data from the images. This is done based on the database received from the Saudi Electricity Company.

– GIS Office Team Activities:

  The GIS office team, with its expertise, engages in drawing the electric network and adjusting it in terms of connectivity, network loads, and other requirements. This is crucial for the accurate representation and effective management of the electric networks in the specified regions.

– Quality Control Team:

  A quality control team is responsible for reviewing the final outputs and preparing them for upload to the Saudi Electricity Company’s server using the ARC FM program. This ensures that all electrical sectors can utilize the data according to their specialization.

The project aims to enhance the efficiency and accuracy of managing electrical networks through GIS, facilitating better decision-making and usage across different electrical sectors in the specified regions.